Liaoning Huake Petroleum Apparatus Science & Technology Co., Ltd.

> Products > Lubricating Oil Test > HK-507A Insulating Oil Breakdown Voltage Tester

HK-507A Insulating Oil Breakdown Voltage Tester

Brand : HK
Product origin : China
Delivery time : within 30 days after recieving full TT payment
Supply capacity : 100set/month

The HK-507A Insulating Oil Breakdown Voltage Tester complies with the requirements of the GB/T 507, DL 429.9, and DL/T 846.7 test methods. It is suitable for determining the dielectric strength of insulating oil filled in electrical equipment in power systems, railway systems, and large-scale petrochemical plants and mines.

Overview

The HK-507A Insulating Oil Breakdown Voltage Tester complies with the requirements of the GB/T 507, DL 429.9, and DL/T 846.7 test methods. It is suitable for determining the dielectric strength of insulating oil filled in electrical equipment in power systems, railway systems, and large-scale petrochemical plants and mines.

Functional Features

  1. 1.The tester adopts a microprocessor to automatically complete operations such as voltage boosting, holding, stirring, standing, calculation, and printing. It can perform oil circulation withstand voltage tests within the range of 0~80kV.

  2. 2.Equipped with a large LCD screen and Chinese menu prompts.

  3. 3.The tester is easy to operate; operators only need to make simple settings to complete the test and obtain results.

  4. 4.Supports power-off data retention, can store 100 test results, and can display the current ambient temperature and humidity.

  5. 5.Uses a single-chip microcomputer to control uniform voltage boosting, with the voltage frequency accurate to 50Hz, making the entire process easy to control.

  6. 6.Equipped with overvoltage, overcurrent, and limit protection to ensure the safety of operators.

  7. 7.Has temperature measurement and display functions, as well as system clock display.

  8. 8.Standard RS232 interface for communication with computers.

Technical Parameters

  1. Power Supply: AC 220V±10%, (50±1)Hz

  2. Power Consumption: 200W

  3. Output Voltage: 0~80kV (optional)

  4. Voltage Distortion Rate: <3%

  5. Voltage Boosting Speed: 0.5kV/s~5kV/s (adjustable)

  6. Standing Time: 15 minutes (adjustable)

  7. Boosting Interval: 5 minutes (adjustable)

  8. Boosting Times: 1~9 times (optional)

  9. Voltage Booster Capacity: 1.5kVA

  10. Measurement Accuracy: ±3%

  11. Environmental Requirements: Temperature 0℃~45℃; Humidity <75%RH



Packaging & Shipping

1 How to deliver?

We can send by Express or by Air. Also we have best transportation solution for DHL, FEDEX, UPS,TNT faster and cheaper

2 What if it broken during transport?

Please do not worry, we do standard export package.

We have 12 months warranty, if it broken during transport, we can change a new one for you. If it is broken after 12 months, we can supply you a new one at a cost price.

Insulating Oil Dielectric Break Down Testastm d1816 

FAQ

1. Why choose us?

Low price:

We are end manufacturer instead of trader or dealer, saving a lot of medium cost, cutting the prices factually and saving money for customers.

High quality:

Our company focuses on product quality. We equip professional research and development team.

Good service:

We could provide product catalog and user manual to customer during inquiry stage. We will offer the installation and operation video, debug video and maintaining videoto our customer before Ex-work.  Following link is the video address which is for our previous customer:

https://www.youtube.com/channel/UC4NDJI_tKsJIuaixCMDQF4w  

We offer fast delivery and secure packing. We provide one year guarantee and long term spare parts supply at cost price.  

2. How can I choose the suitable one?

We design and manufacture our testers based on ASTM, IP, ISO standards, so user may tell the exact standard or test method to us, and then we can offer our solution.

3. How can I pay?

We accept many payment terms, such as T/T, L/C, Western Union, PayPal, and money gram and so on.

4. When I receive it after pay?

Normally, we have testers in our stock, if not, we can deliver within 5-7 days, please contact us to check transport time and charge to your address.

5. What should I do if I do not know how to use?

Please do not worry, manual user will be sent together, also we can offer Operation and installation video, you can also contact us with more technological support.

6. What should I do if some parts broken?

Please do not worry, we have 12 months warranty except accessories, you can also buy parts from us after 12months.

7. Can I order OEM/ ODM services?

YES, product can be customized.


Please feel free to give your inquiry in the form below. We will reply you in 24 hours.
Message